{"id": "rg-b6f4e87cb1", "tag": "Specification Guide", "title": "Custom Stone Specification Checklist", "slug": "custom-stone-specification-checklist", "excerpt": "Custom Stone Specification Checklist lists technical requirements to fix before custom stone fabrication—dimensions, finishes, tolerances, and documentation.", "content": "Custom Stone Specification Checklist lists technical requirements to fix before custom stone fabrication—dimensions, finishes, tolerances, and documentation. Quotes and schedules depend on an approved shop-drawing package, not concept images alone. Role-specific drawing guidance is on [For architects](/for-professionals/architects/).\n\nArchitects, interior designers, builders, and estate owners use this page when the decision is still open—before a project quote is locked.\n\nList piece marks, thickness, finish, and joint tolerances on shop drawings. Include anchoring, backing, and site interfaces your installer needs. Name who approves shop drawings on the design team.\n\nFabrication packages should be complete enough that production does not pause for missing dimensions. Changes after approval usually reset lead time and cost.\n\n[Specification Guides](/resources/specification-guides) · [For architects](/for-professionals/architects/) · [How we work](/how-we-work)\n\nNext step: Send preliminary dimensions, finish schedule, and who approves shop drawings on your team.", "image": "", "published": true, "resourceCategory": "specification-guides", "createdAt": "2026-08-31T12:22:00.262337Z", "viewCount": 0}